Beginning at discussion from Indonesia oil and gas mailing list, recently there are some alteration in ASME code, especially in Allowable Stress, design pressure, hydrotest pressure and corrosion allowance. For detail information, following an article from Becht Engineering Mechanics.
Change in ASME B&PV Code Allowable Stresses
The allowable stress in the pressure vessel code has changed [...]

Pertanyaan ini berawal dari aku bersama istri dan anakku lagi JJS (Jalan-jalan sore). Kami bertiga berencana ke BC ( Balikapapan Center) yg ada di daerah klandasan, Balikpapan. Kami naik angkot yg ada di BP (Balikapapan Permai), sebuah kawasan ruko2 dan sekalian terminal + pasar. BP sangat ramai dikunjungi orang, karena selain fungsinya sebagai terminal, juga [...]

Challenging Opportunities at PT Badak Natural Gas LiquefactionPT Badak NGL, a world class natural gas liquefaction company operating 8 (eight) sophisticated LNG Plants in East Kalimantan, cordially invites experienced professionals to occupy the following vacant positions:
 
A) Sr. Engineer Instrumentation (ENG/B), Electrical (ELC/B), Rotating Equipment (ROT/B), Process Train (PRC/B)

PT Petrosea Tbk has been designing, building and mining in all corners of Indonesia since 1972 and today is recognized as one of Indonesia’s leading engineering, construction and mining contractors. Thanks to the imagination and commitment of more than 1877 staff, Petrosea has secured a growing portfolio of projects throughout Indonesia and the region.
Our strategic [...]

PT.MBP Skill Indonesia
The Human Resources Specialist in CONTRACTING – CONSULTING –
RECRUITING – TRAINING – FORMALITIES
URGENTLY REQUIRED
One of our clients who are leading in Gold Mining company is urgently
looking for candidates for the position of :
CIVIL STRUCTURE ENGINEER (Code : MBP 211–79 - 02)

keep looking »